Zalson Jewelry

Manufacturing Process

Jewelry Manufacturing Process

Follow the jewelry manufacturing path from brief and CAD through sampling, approval, production, inspection and delivery.

TL;DR

Direct Answer

The process begins with a measurable brief, moves through CAD and a physical sample where required, and releases production only after approval. Typical sampling is about 7 business days and typical production is about 30 business days, with plating and complexity affecting timing.

Typical sample timing
About 7 business days

Design and plating can affect timing

Typical production timing
About 30 business days

Confirmed after sample approval

Sample revisions
Up to 3

Physical sample approval

Production MOQ
30 pieces per style

Mix of styles quoted separately

From Brief to Delivery

Each stage has a specific buyer decision. This keeps a visual reference from being mistaken for a production-ready specification.

Swipe to compare →

StageWhat happensBuyer decision
1. BriefReference, dimensions, target weight, material, stones and quantity are reviewedConfirm the intended product
2. CADConstruction and details are translated or checkedApprove the design direction
3. SampleCasting, setting, finishing and plating are tested as applicableApprove the physical sample
4. ProductionApproved specifications move into the agreed production routeApprove any documented change
5. Quality controlMaterial, finish, setting, dimensions and packaging are checkedResolve exceptions before shipment
6. DeliveryBalance, export documents, carrier, insurance and tracking are confirmedRelease shipment

Timing and Change Control

Sample work typically takes about 7 business days. Production typically takes about 30 business days after approval. Plating can extend timing, and changes after physical sample approval may require revised cost and schedule confirmation.

Records for Repeat Orders

CAD drawings and relevant rubber or steel mold records can be retained for future replenishment. Every repeat order still checks stones, material, plating and packaging before production.

Buyer Questions

Frequently Asked Questions

Is Zalson Jewelry a registered jewelry business?

Yes. Zalson Jewelry is operated by Guangzhou Zalson Jewelry Co., Ltd., a Guangzhou-registered limited company established on July 10, 2017 under Unified Social Credit Code 91440101MA59QA5C30. Its self-operated showroom and production site is in Shatou, Panyu District, Guangzhou.

Can buyers order a sample before production?

Yes. Sample work begins after the sample fee and brief are confirmed. A typical sample takes about 7 business days, up to three revisions can be reviewed, and production begins only after physical sample approval. Timing varies with design and plating requirements.

What is the minimum order quantity?

The minimum production order is 30 pieces per style. Send the reference, dimensions, target weight and estimated quantity so materials, stone setting, packaging and the quotation can be reviewed.

Can buyers visit the facility?

Yes. In-person visits can be arranged with at least three days' notice. A recorded video review can also be discussed for overseas buyers who cannot visit Guangzhou.

When does bulk production begin?

Bulk production begins after the physical sample, product specification, quantity, commercial terms and any market requirements are confirmed.

What can change the timeline?

Design complexity, revision cycles, stone sourcing, material, plating and order quantity can change timing. Plating is a specifically identified scheduling factor.

Start a conversation

Tell us about your jewelry project

Send the product reference, dimensions, target weight, material, stones, estimated quantity and destination market. A typical sample takes about 7 business days once the scope is confirmed.

Request a Quote